Camden Yards will receive a face-lift this winter as the Orioles prepare to play their 20th season in the ballpark. The Maryland Stadium Authority intends to install drink rails in portions of the club-level seating bowl along the left field and right field lines. There are also plans for bistro tables facing the field on the left field club level. The club level and upper deck will be furnished with wider seats, and less intrusive railings will be installed in front of the first few rows of both levels. The upgrades will reduce the seating capacity of the ballpark to 45,971 from 48,290.